Our Services
"Trust God with your work, He guides your plans."
-Proverbs 24:3
In PROVERBS CONSTRUCTION CORPORATION, we envision a world where architecture is not just about constructing buildings but about creating spaces that inspire, uplift, and endure. We specialize in creating unique, quality projects focusing on budget-oriented designs that cater to our clients' needs.


DESIGN SERVICES
Architectural Plans
Civil Engineering Plans
Structural Engineering & Calculation
Electrical & Plumbing Plans
Mechanical & Fire Protection Plans
Geodetic Engineering Plans

Design Fee
Our design fee package depends on the complexity and size of the project. Although each project is unique and the fee could vary depending on several factors, for budgetary purposes and to give you an idea of how much it would cost for us to design your project, these are our usual rates (Please remember that should the construction contract be awarded to us, cost of Engineering Design Plans will be deducted from the construction contract cost as discount):
Class A (Single A or Standard Design)
Rates
1 - Storey or Bungalow House / Building PHP 30,000 - 50,000
2 - Storey House / Building PHP 40,000 - 65,000
3 - Storey House / Building PHP 50,000 - 70,000
4 - Storey House / Building and Above PHP 60,000 -100,000 and up
Inclusions
Architectural/Civil Engineering Design
Structural Plans
Electrical & Plumbing Plans
Specifications
Bill of Materials
Exclusions
Interior 3D Perspective
and Geotechnical Soil Test (Required for 3 - storey / floor and above)
Class A (Single A or Standard Design)
+ 3D Interior of Main Rooms
Rates
1 - Storey or Bungalow House / Building PHP 60,000 - 90,000
2 - Storey House / Building PHP 70,000 - 100,000
3 - Storey House / Building PHP 80,000 - 110,000
4 - Storey House / Building and Above PHP 90,000 -110,000 and up
Inclusions
Architectural/Civil Engineering Design
Structural Plans
Electrical & Plumbing Plans
Specifications
Bill of Materials
Interior 3D Perspective for Living Area, Dining, Kitchen, Master Bedroom,
Master Toilet & Bath
Exclusions
Interior 3D Perspective (Other Bedrooms, Common Toilet & Bath)
Geotechnical Soil Test (Required for 3 - storey / floor and above)
Class AAA (Triple A) or Standard Design + 3D Interior of All Rooms
Rates
1 - Storey or Bungalow House / Building PHP 80,000 - 300,000
2 - Storey House / Building PHP 120,000 - 400,000
3 - Storey House / Building PHP 130,000 - 450,000
4 - Storey House / Building and Above PHP 150,000 -500,000 and up
Inclusions
Architectural/Civil Engineering Design
Structural Plans
Electrical & Plumbing Plans
Specifications
Bill of Materials
Interior 3D Perspective of ALL ROOMS including Living , Dining, Kitchen, all Bedrooms
and Toilet and Baths.
Exclusions
Geotechnical Soil Test (Required for 3 - storey / floor and above)
Special Engineering and
Interior Design Packages
Rates
Structural Engineering Plans PHP 5,000 - 25,000 and up
Electrical Plans PHP 5,000 - 25,000
Plumbing Plans PHP 5,000 - 25,000
Mechanical Plans PHP 5,000 - 25,000
Interior Perspective Plans: PHP 10,000 - 50,000 and up
Geotechnical Soil Test Report PHP 25,000 - 80,000 and up
(For 3 storey structures and above)
Geodetic Lot Plan and Vicinity Map PHP 2,000
Feng Shui Planning including Kua Number Starts at PHP 20,000
Design Package
Bungalow to 2-Storey Design Plans
(Lot area not more than 200 square meters and not Sloping Lot)
PHP 10, 000.00 Down payment for floor plan layout 2 weeks
PHP 20, 000.00 Upon approval of floor plan layout, 2 weeks
Down payment for 3D Perspective
PHP 15, 000.00 Upon approval of perspective, 2 weeks
Down payment for Engineering
and Working Drawings
PHP 5, 000.00 Upon acceptance of Printed Plans 1 week
and Documents
PHP 50,000.00 Total Design Package
Bungalow to 2-Storey Design Plans
(Lot area not more than 200 square meters, Sloping Lot)
PHP 15, 000.00 Down payment for floor plan layout 2 weeks
PHP 20, 000.00 Upon approval of floor plan layout, 2 weeks
Down payment for 3D Perspective
PHP 20, 000.00 Upon approval of perspective, 2 weeks
Down payment for Engineering
and Working Drawings
PHP 5, 000.00 Upon acceptance of Printed Plans 1 week
and Documents
PHP 60,000.00 Total Design Package
3-Storey Design Plans
PHP 20, 000.00 Down payment for floor plan layout 2 weeks
PHP 25, 000.00 Upon approval of floor plan layout, 2 weeks
Down payment for 3D Perspective
PHP 15, 000.00 Upon approval of perspective, 2 weeks
Down payment for Engineering
and Working Drawings
PHP 10, 000.00 Upon acceptance of Printed Plans 1 week
and Documents
PHP 70,000.00 Total Design Package
Package Inclusions
7 sets Blueprints Architectural / Civil Engineering Plans signed and sealed
7 sets Blueprints Structural Plans signed and sealed
7 sets Blueprints Electrical Plans signed and sealed
7 sets Blueprints Plumbing Plans signed and sealed
3 sets Printed Papers Structural Design Analysis and Computations
3 sets Printed Papers Specifications
3 sets Printed Papers Bill of Materials
1 set Printed Papers Cost Estimate for Construction
1 set Photocopy P.R.C. I.D.s and PTRs signed and sealed of Professionals
Package Inclusions
7 sets Blueprints Architectural / Civil Engineering Plans signed and sealed
7 sets Blueprints Structural Plans signed and sealed
7 sets Blueprints Electrical Plans signed and sealed
7 sets Blueprints Plumbing Plans signed and sealed
3 sets Printed Papers Structural Design Analysis and Computations
3 sets Printed Papers Specifications
3 sets Printed Papers Bill of Materials
1 set Printed Papers Cost Estimate for Construction
1 set Photocopy P.R.C. I.D.s and PTRs signed and sealed of Professionals
Package Inclusions
7 sets Blueprints Architectural / Civil Engineering Plans signed and sealed
7 sets Blueprints Structural Plans signed and sealed
7 sets Blueprints Electrical Plans signed and sealed
7 sets Blueprints Plumbing Plans signed and sealed
3 sets Printed Papers Structural Design Analysis and Computations
3 sets Printed Papers Specifications
3 sets Printed Papers Bill of Materials
1 set Printed Papers Cost Estimate for Construction
1 set Photocopy P.R.C. I.D.s and PTRs signed and sealed of Professionals
Package Exclusions
Lot Plan by Geodetic Engineer – By lot owner PHP 2,000.00
Soil Test Report– For more than 2 storey PHP 25,000.00
Sign and Seal for In charge of Construction PHP 30,000
for Building, Electrical, Structural and Plumbing
Permit Forms (For Contractor)
Interior 3D
Topographic Survey (Required for Sloping Lot) PHP 26,000 to 35,000
Design Process
Approximately 5-9 Weeks
Package Exclusions
Lot Plan by Geodetic Engineer – By lot owner PHP 2,000.00
Soil Test Report– For more than 2 storey PHP 25,000.00
Sign and Seal for In charge of Construction PHP 30,000
for Building, Electrical, Structural and Plumbing
Permit Forms (For Contractor)
Interior 3D
Design Process
Approximately 5-9 Weeks
Package Exclusions
Lot Plan by Geodetic Engineer – By lot owner PHP 2,000.00
Soil Test Report– For more than 2 storey PHP 25,000.00
Sign and Seal for In charge of Construction PHP 30,000
for Building, Electrical, Structural and Plumbing
Permit Forms (For Contractor)
Interior 3D
Topographic Survey (Required for Sloping Lot) PHP 26,000 to 35,000
Design Process
Approximately 5-9 Weeks

Finishes
Finishes depends on the following details below. Please note that the description below are only rough descriptions and may vary depending on the actual design and situation.
Bare
Ceiling No Ceiling, Flat Ceiling
Flooring Cement Finish, Ceramic Tiles
Exterior Wall Finishes Paint
Interior Wall Finishes Paint
Windows Jalousie, Steel Windows
Doors Simple Wood, PVC for Toilets
Lockset & Hinges Economic
Toilet & Bath Tiles 20 x 20 cm, 30 x 30 cm Ceramic Tiles
Toilet & Bath Fixtures (Water Closet/ Lavatory) Economic
Kitchen Fixtures (Sink and Countertop) Economic
Lighting & Electrical Fixtures Economic
Railings Steel
Semi-Luxury
Ceiling
Living Cove Lights
Others Flat Ceiling
Flooring
Living Granite Tiles
Others Ceramic Tiles
Exterior Wall Finishes Paint Finish with Stone Accents at Specific Areas
Interior Wall Finishes Paint Finish with Stone Accents at Specific Areas
Windows Aluminum Analoc, uPVC White Windows
Doors
Exterior Solid Wood
Interior Hollow Core
Toilets PVC
Lockset & Hinges Semi-Luxury
Toilet & Bath Tiles 30 x 30 cm Ceramic Tiles
Toilet & Bath Fixtures (Water Closet/ Lavatory) Semi-Luxury
Kitchen Fixtures (Sink and Countertop) Semi-Luxury
Lighting & Electrical Fixtures Semi-Luxury
Railings Steel with Wood Top
Standard
Ceiling Flat Ceiling
Flooring Ceramic Tiles
Exterior Wall Finishes Paint with Accent Colors
Interior Wall Finishes Paint with Accent Colors
Windows Aluminum, uPVC White Windows
Doors Simple Wood, PVC for Toilets
Lockset & Hinges Regular
Toilet & Bath Tiles 20 x 20 cm, 30 x 30 cm Ceramic Tiles
Toilet & Bath Fixtures (Water Closet/ Lavatory) Standard
Kitchen Fixtures (Sink and Countertop) Standard
Lighting & Electrical Fixtures Standard
Railings Steel
Luxury
Ceiling
Living Cove Lights
Others Cove Lights
Flooring
Living Granite Tiles, Wood Floors
Others Granite Tiles, Wood Floors
Exterior Wall Finishes Paint with Stone Accents at
Specific Areas
Interior Wall Finishes Paint with Stone Accents at
Specific Areas
Windows Aluminum Powdercoated
uPVC White Windows
Doors
Exterior Solid Wood
Interior Solid Wood
Toilets Solid Wood
Lockset & Hinges Luxury
Toilet & Bath Tiles 30 x 60 cm Ceramic Tiles
Toilet & Bath Fixtures (Water Closet/ Lavatory) Luxury
Kitchen Fixtures (Sink and Countertop) Luxury
Lighting & Electrical Fixtures Luxury
Railings Glass, Steel with Wood Top
Design Process
Approximately 5-9 Weeks
Meeting & Data Gathering
Requirements:
1. Copy of Title or Transfer Certificate of Title (TCT)
2. Lot Plan (if TCT is not available)
3. Commercial Space, Condominium Unit or Office Space measurements or plans
(if project is not a house / building)
4. Room requirements such as bedrooms, toilet and bath, family hall, entertainment
room, gym etc.
5. Honest Construction Budget so we may tell you early on if the project is feasible or not.
6. Copy of Subdivision / Administration design restrictions (if needed)
Floor & Space Planning
Timeline 2 Weeks
Downpayment 25%
3D Perspectives
Timeline 2 Weeks
Downpayment 30%
Engineering Plans and Working Drawings
Timeline 2 Weeks
Downpayment 30%
Printing of Plans & Technical Documents for Building Permit
Timeline 1 Week
Downpayment 15%
Construction Phase